Handheld cell use illegal when driving

Road Closure: D1 ~ Southbound I-15, south of Mesquite, NV: Single Lane Restriction, Road Obstruction, Roadwork   More Detail.

Annual Work Program

Annual Work Program Transportation Projects

AWP Page Photo

The Annual Work Program satisfies Nevada Revised Statute (NRS) 408.203 requiring the Director of NDOT to submit a 3 and 10 year list of transportation projects to the State Legislative Council Bureau (LCB) every even year, and the State Legislature every odd year.

Projects in the Work Program are sorted by county with each of the seventeen (17) counties represented with its own section and a section for the Tahoe MPO (TMPO).

The Work Program is composed of three elements:

  • The Annual Work Program (AWP) lists the current fiscal year projects to include the betterment and rehabilitation projects completed by state forces and district contracts.
  • The Short Range Element (SRE) lists projects state and local entities would like to initiate within the next 2 to 3 years.
  • The Long Range Element (LRE) lists projects in the planning stage or extensions of current projects to be completed in 4 to 10 years.

It also includes certain elements from the currently published Transportation System of Projects (TSP) (See Inputs to the TSP diagram) excluding transit and regionally significant non-Federal projects.

To download a PDF with a detailed list of projects for each county, click on any of the counties listed below.

Projects by County
AWP Introduction 15 kb Lincoln County 2.0 Mb
CAMPO 1.2 Mb Lyon County 2.3 Mb
Churchill County 4.7 Mb Mineral County 2.5 Mb
Clark County 15.9 Mb Nye County 1.6 Mb
Douglas County 2.2 Mb Pershing County 1.2 Mb
Elko County 2.5 Mb Storey County 1.7 Mb
Esmeralda County 1.3 Mb Washoe County 4.7 Mb
Eureka County 1.2 Mb White Pine County 4.1 Mb
Humboldt County 1.8 Mb TMPO 1.0 Mb
Lander County 1.1 Mb Nevada Regional Programs 114 kb